ITEM | PROJECT TITLE | EMPLOYER/CONSULTANT | CONSTRUCTION COMMENCEMENT | PERIOD COMPLETION |
1. | SUB-CON FOR REPAIRING AND MAINTENANCE SERVICES FOR P.A SYSTEM IN EVERY ROOM WHICH THAT HAVE P.A SYSTEMS FOR THREE YEARS IN UITM PUNCAK ALAM, SELANGOR | UNIVERSITI TEKNOLOGI MARA | 05/01/2016 | 04/01/2019 |
2. | PROJECT OF PHASE HOUSING SCHEME WHICH CONTAINS PHASE 1 (43 UNITS) AND PHASE 2 (48 UNITS) AND PHASE 3 (32 UNITS) FOR DOUBLE STOREYTERRACE HOUSE (20’x75’) ONTHE LOT 4349,MUKIMTERAS, DAERAH RAUB, PAHANG DARUL MAKMUR - KERJA-KERJA ELEKTRIK UNTUK PENCAWANG AWAM |
MILLENNIUM ARCH (M) SDN.BHD. | 10/01/2018 | 10/02/2018 |
3. | MAINTENANCE OFFICE | AIRASIA BERHAD | 20/03/2018 | 02/04/2018 |
4. | GENERAL FACTORY MAINTENANCE BOMBA FC RENEWAL FOR YEAR 2018 | TELE – PAPER (M) SDN. BHD. | 29/01/2018 | 01/03/2018 |
5. | PROJECT OF PHASE HOUSING SCHEME WHICH CONTAINS PHASE 1 (43 UNITS) AND PHASE 2 (48 UNITS) AND PHASE 3 (32 UNITS) FOR DOUBLE STOREY TERRACE HOUSE (20’x75’) ON THE LOT 4349, MUKIM TERAS, DAERAH RAUB, PAHANG DARUL MAKMUR | MILLENNIUM ARCH (M) SDN.BHD. | 01/04/2018 | 30/05/2018 |
6. | TO SUPPLYINSTALL, TESTING, COMMISIONNING FOR SPRINKLER SYSTEMS AT NEW OFFICE, SECTION 25 | TELE- PAPER (M) SDN.BHD | 04/05/2018 | 18/06/2018 |
7. | PROJECT OF PHASE HOUSING SCHEME WHICH CONTAINS PHASE 1 (43UNITS) AND PHASE 2 (48 UNITS) AND PHASE 3 (32 UNITS) FORDOUBLE STOREYTERRA CE HOUSE (20’ x7 5’ )O NT HE LOT 4349, MUKIM TERAS, DAERAH RAUB PAHANG DARUL MAKMUR. - FOR ELECTRICAL & TELEPHONE INSTALLATION WORKS |
MILLENNIUM ARCH (M) SDN. BHD. |
20/04/2017 | 31/05/2018 |
8. | TO SUPPLY, INSTALL, TESTING, COMMISIONNING FORSPRINKLER SYSTEMS AT NEW OFFICE, SECTION 25 | TELE – PAPER (M) SDN.BHD. | 20/04/2018 | 20/06/2018 |
9. | MAINTENANCE OFFICE | AIRASIA BERHAD | 31/07/2018 | 06/08/2018 |
10. | OFFICE EQUIPMENT AD HOC TECHNICAL WORKS IN RedQ, RECOLATION OF SEATING ARRANGEMENT, ADDITIONAL SOCKET OUTLET AND DATA PORT |
AIRASIA BERHAD | 18/10/2018 | 31/10/2018 |
11. | MAINTENANCE OFFICE SUPPLY/ADDITIONAL SOCKET OUTLET 12AMP & RECONNECTION DATA LINE CAT6 4 PAIR UTP CABLE OFFICE AREA |
AIRASIA BERHAD | 26/03/2019 | 08/04/2019 |
12. | KERJA MEMASANG SISTEM PENCEGAH KEBARAKAN WET CHEMICAL BAGI DAPUR KAFETRIA DEWAN JUBLI PERAK, SULTAN ABDUL AZIZ. | AMINI SERVICES AND SUPPLY | 02/06/2019 | 10/06/2019 |
13. | KERJA MEMBAIKPULIH PENDAWAIAN DAN BERKAITAN ELEKTRIK SERTA MENAIKTARAF KEPADA BEKALAN KUASA PULAU INDAH. | POWER MAX SALES & SERVICES | 18/12/2019 | 19/12/2019 |
14. | SUPPLY ADDITIONAL WIRING DATA GATE AT OFFICE AREA LOCATION | AIRASIA BERHAD | 20/03/2020 | 20/04/2020 |
15. | INSTALL CLUSER DEST, L-SHAPE, DESTE AND RE-WIRING SOCKET OUTLET13AMP LOCATION L6 22. | AIRASIA BERHAD | 03/04/2020 | 17/04/2020 |
16. | KERJA - KERJA ELEKTRIKAL DI RUMAH HAKIM SHAH ALAM | MAHKAMAH NEGERI SELANGOR | 16/03/2020 | 01/04/2020 |
17. | KERJA MEMBEKAL DAN MEMASANG AKSESOKI (HT/LV/GENSET) | ABR ROBBEL (LJT) | 18/06/2020 | 15/07/2020 |
18. | CADANGAN MEMBINA DAN MENAIKTARAF JEJANTAS DAN LALUAN PEJALAN KAKI DARI PEMBANGUNAN PROJEK BBCC SDN.BHD | N.Y.C CONTRACTS SDN BHD | 08/11/2019 | 07/08/2020 |
19. | PENDAWAIAN SEMULA DI SK BANDAR, DAERAH HULU LANGAT, NEGERI SELANGOR DARUL EHSAN. | JABATAN KERJA RAYA SELANGOR | 20/06/2020 | 26/08/2020 |
20. | CADANGAN MEMBAIKPULIH KABEL BEKALAN ELEKTRIK BAGI INFRASTRUKTUR LAMPU JALAN SERTA KERJA-KERJA BERKAITAN DI PERSIARAN SP1 DAN PERSIARAN SP2, SELANGOR CYBER VALLEY, SELANGOR DARUL EHSAN | PERBADANAN KEMAJUAN NEGERI SELANGOR (PKNS) | 28/12/2020 | 07/03/2021 |
21. | TO DESIGN, SUPPLY, DELIVER AND INSTALLATION FOR CABLE LADDER FROM N18 TO RUNNING RAIL AT SUNGAI BESI STATION (S65) UPTRACK, AMPANG LINE AND INSTALLATION SOLAR LAMP POST EQUIP WITH MOTION SENSOR, BUZZER, TIMER, AND CCTV NEAR THE LOCATION |
RAPID RAIL SDN BHD | 01/02/2021 | 31/03/2021 |
22. | WIRING WORK FOR SOLARIS ROTUNDA SITE (PUBLIKA) | N.Y.C CONTRACTS SDN BHD | 30/04/2021 | 13/05/2021 |
23. | CADANGAN KERJA-KERJA MENAIKTARAF PANEL SISTEM PENCEGAH KEBAKARAN JENIS KONVENSIONAL DAN KERJA-KERJA BERKAITAN DI BLOK A DAN BLOK B PERPUSTAKAAN SULTAN ABDUL SAMAD, UNIVERSITI PUTRA MALAYSIA |
UNIVERSITI PUTRAMALAYSIA | 01/04/2021 | 01/07/2021 |
24. | PERKHIDMATAN PENGUJIAN DAN PENENTUKURAN SEMULA ALAT GEGANTI PERLINDUNGAN YANG TELAH TAMAT TEMPOH PADA 28 OGOS 2021 SERTA KERJA MENGALIHKAN LAMPU DARI TEMPAT TINGGIDAN MENGGANTI LAMPU YANG ROSAK DI MENARA MBSB | PERMODALAN NASIONAL BERHAD | 11/10/2021 | 24/10/2021 |
25. | PERKHIDMATAN PENGUJIAN DAN PENENTUKURAN SEMULA ALAT GEGANTI PERLINDUNGAN YANG TELAH TAMAT TEMPOH PADA 28 OGOS 2021 SERTA KERJA MENGALIHKAN LAMPU DARI TEMPAT TINGGI DAN MENGGANTI LAMPU YANG ROSAK DI MENARA MBSB | PERMODALAN NASIONAL BERHAD | 11/10/2021 | 24/10/2021 |
26. | KERJA-KERJA PENGGANTIAN KABEL ELEKTRIK VOLTAN RENDAH PAKEJ 2E: PENGGANTIAN PAPAN SUIS UTAMA DI BANGUNAN MARKAS PANGKALAN UDARA (BHQ) SERTA KERJA-KERJA BERKAITAN DI PANGKALAN UDARA SUBANG, SHAH ALAM. | JABATAN KERJA RAYA TUDM SUBANG | 30/09/2021 | 30/03/2022 |
27. | CADANGAN SUSUN ATUR DAN PENSTRUKTURAN BILIK-BILIK DAN RUANG KERJA TERMASUK MEMBEKAL, MEMASANG, MENGUJI DAN MENTAULIAH MEKANIKAL DAN ELEKTRIKAL (M&E), NETWORKING DAN PERABOT DI TINGKAT 1,2,5,6,7 DAN 10 DI MENARA SURUHANJAYA KOPERASI MALAYSIA | JABATAN KERJA RAYA KUALA LUMPUR | 05/10/2021 | 04/01/2022 |
28. | KERJA-KERJA PENYENGGARAAN SISTEM LAMPU JALAN NEGERI DI JALAN SUNGAI TUA (B23) MENGHALA KE TAMAN JASA UTAMA DAN DARI SIMPANG JALAN KUCHING MENGHALA KE STESEN KOMUTER BATU CAVES, DAERAH GOMBAK, SELANGOR DARUL EHSAN | JABATAN KERJA RAYA SELANGOR | 28/03/2022 | 23/05/2022 |
29. | PROPOSED RECTIFICATION OF STREET LIGHTING AT THE VILLAS AND PEARL, BANDAR ENSTEK, NEGERI SEMBILAN DARUL KHUSUS | THP ENSTEK DEVELOPMENT SDN BHD | 08/06/2022 | 07/09/2022 |